How To Build An Above Ground Swimming Pool Deck
Fit bolts through every hole from inside the pool frame so that the bolt end protrudes through the ledger board.
How to build an above ground swimming pool deck. It is important to remember when cutting posts to size that each one should be set at least two feet below grade. Another choice is the 5 x 13 5 2. Step 1 measure your pool. Tips to build an above ground pool deck the typical cost of building an above ground deck at home is around us 2 700.
The first step in building an above ground pool deck is to mark and install your support posts based on the deck design. So i thought this was a great opportunity to show them how to build one and. We have deck kits in 5 ft x 5 ft square and a 5 ft x 10 ft. Complete the pool deck frame by screwing 2 x 4 diagonal braces to the 4 x 4 posts.
The bracing isn t required if the deck is less than 30 in. Make sure you have an accurate record of the diameter and the height of the pool. Drill through your ledger and the metal pool flange as described in the section on ledger boards. The numbers cover basic materials such as pier blocks lumbers and screws.
Take your rough plan to your local building department or ask a building inspector to come to your home 1 x. This 24 round above ground pool deck plans graphic has 20 dominated colors which include black cat thamar black pig iron siesta gehenna s gold steel namakabe brown silver kettleman mid tan wool tweed medlar. Now set the pier blocks and posts for the 10 x. This summer our girls wanted to add a deck to one side of the above ground pool.
If you have an above ground pool and you want to build a pool deck around it to get maximum use keep these building solutions in mind. You will need this to determine the dimensions for the deck step 2 decide on the dimensions of your deck. Do this at least every 24 inches in the pools edge and one at the top of each post in the pool s frame. Plan plenty of width between the edges of the pool and the perimeter of the deck so that swimmers can walk comfortably step 3 obtain any necessary permits.
Our above ground pool deck kits are prefab resin kits with everything you need to add steps to walk up to the deck and into the pool.